Phase I: Design & install 20 metres of lagged shoring. Phase II: Design & install tangent wall shoring for a 10m x 12m x 10m deep crib. Shoring Design: Topping Engineering Ltd.
Updated: 26 July 2010.
Contractor: DOMCO Construction Inc.