TransCanada PipeLines Limited Keystone Project
Moosomin
SK
AGRA supplied and installed 181 - 324mm, 406mm, and 508mm diameter pipe piles up to 15.5 meters long, a total of 2,419 lineal meters, utilizing a Linkbelt LS118 crane, Delmag D19 diesel hammer, and Berminghammer H12 VTL during 02-29 April 2009.
Client: Raven Construction Management - Brantford ON.